Phase 2 Construction of first staircase (^stair1) Absolute Date: LC |  |
Phase 3j Floors and accumulations in front of ^stair1 |  |
Phase 3l |  |
Phase 3m Construction of the monumental access |  |
Phase 3p Construction of western flanking wall (^wall3) |  |
Phase 3s Use of monumental access, build-up of floors |  |
Phase 4c Sloping accumulations forming at the base of the revetment wall |  |
Phase 7a Mittani curtain wall and build-up in front of revetment wall. |  |
Phase 7d |  |
Phase 7e Erosion followed by massive brickfall. Eventually leveled and construction of second apron (^apr2) |  |
Phase 8m Scattered stones and use above second apron |  |
Phase 8r Scattered use including tannurs |  |
Phase 9m Topsoil Accumulation |  |